Renewable Energy

600,000 CBM of Renewable Energy Cargo

TSL negotiated and coordinated an eight-month program moving 600,000 CBM of renewable energy cargo from China to Thailand, with zero safety incidents.

600,000 CBM of Renewable Energy Cargo
Client
Siemens Gamesa
Route
China to Thailand
Cargo
600,000 CBM of renewable energy cargo
Milestone
Largest Contract of Affreightment (COA) by volume ever executed by TSL.

The challenge

Our client needed a massive volume of renewable energy cargo moved from China to Thailand on a tight production schedule, with every unit arriving safely and on time.

Our solution

On behalf of our client, TSL negotiated and coordinated the full transportation program. We sourced the right vessel types and optimized stowage so all units could ship safely according to a specially designed shipment plan.

TSL coordinated each shipment closely to keep pace with production and assisted with every commercial aspect of the project.

The result

Zero safety incidents were reported during the eight-month Contract of Affreightment. The only minor damage was resolved and covered locally by TSL before delivery to site.

Key strengths
  • Full attention to timely execution.
  • Experienced, thorough negotiation of booking note details to mitigate risk.

Have a similar cargo?

Let's talk about how we would move it.

Contact us
All case studies